ScuzzBlog: Diaries June 2017
Entry 27th June 2017: Post: 3
More quiet than expected
Hi
The nice man from UK Mail arrived in the rain at 17.30 with a box and
was greeted by me with a screwdriver. He laughed. 17.31 put kettle on.
By 17.35 I had recorded all the connectors for the replacement PSU.
Removed screws and removed old and reconnected new ... time 17.40. I
then simply plugged in and connected monitor and the kettle had boiled
and I was sitting watching the video I was running on loop when she
popped on Sunday. So £14.50 for five minutes work and job done. And I
don't even have to water the garden tonight.
scuzz
|